Chapter 20
Building a Flood-Ready Tampa
Watershed plans, basin scorecards, and green-gray infrastructure that actually drains — published, not promised.
8 proposalsFlagship: Flood Resilience Operating System
TOT-P4-C20-001Building a Flood-Ready Tampa→TOT-P4-C20-002Watershed Master Plan operationalization and basin scorecards→TOT-P4-C20-003Stormwater asset-condition register and capacity recovery→TOT-P4-C20-004Green-gray alternatives requirement→TOT-P4-C20-005Forecast-informed real-time control pilot→TOT-P4-C20-006South Howard accountability case study→TOT-P4-C20-007CitySync Flood Resilience Portfolio→TOT-P4-C20-008Flood Resilience Operating System→
Make this real
Fund the fight for Building a Flood-Ready Tampa.
Help move this chapter from a public plan to public action.